Recolor of CaravanSims Arcan living room.

Dark wood and rough iron recolors of console, both coffee tables and bookcases + blue recolor of the candles:

(5 files / 0.2 Mb)

10 different fabric patterns of the chair, sofa and both meridiennes:

Download 1 to 5 / Download 6 to 10

(20 files / 3.2 Mb each)

Meshes are NOT included. Download them here (Arcan Livingroom by Frances).

Click here to have a closer look at the sofa fabric paterns.

In-game previews: