27 wall papers and 5 floors.
Some walls are ment to be couple together for 2 or 3 stories building.
1 (ab), 2 (ab), 5(ab), 6(ab), 8 (ab) and 9 are stand alone.
3 (ab) must be coupled with 3 (cd) for 2 stories building.
4 (ab) must be coupled with 4 (ef) for 2 stories, and with 4(cdef) for 3 stories building.
Same goes for the 7 serie (if you wan to use the 7 serie texture on one storie buildings, use 6(ab)).

(check the preview bellow for illustration).

Floors are (2x2). 1b is a 90 rotation of 1a.

A collection file is also included.



(21 files / 1.6 Mb)

Important note :

these walls are semi-seemless, which means that they won't align properly unless you alternate a with b, c with d and/or e with f.
This was done to reduce the redundancy effect of these textures.

All the textures from these files have been extracted from "the Vampire ~ the masquerade: bloodlines" video game.
One of my favorites outside the sim universe :)

In-game previews:



Preview credits: Wall lamp by Avenida Sims. Poster mesh by Pixel Hate, recolors by me, available here.
More in game previews in the screenshot section. Check the cemetary serie, under "Misc".