15 recolors of Avalon's short blinds, from the bar set.
(object is one tile only. I placed 2 blinds side by side on the previews).



(16 files / 1.9 Mb / Mesh included)

Click here to have a closer look at the blinds fabric paterns.

Note: texture for blinds n°9 is actually striped.

In-game previews:




Preview credits: Walls by Decorgal. White Cafe Shutters by khakidoo. Plant by 4 ever sims fantasy.
Sofa and bookcase meshes by Caravan sims (recolor by me, available here).